Total Pageviews

Saturday, March 17, 2018


I have drilled out spotwelds and removed a floor from a Vespa frame before and it takes about 2 hours. That's how long it took to drill these 3 out.
3 layers of welded steel. I decided to take it home and work on the spotwelds in my spare time.


No comments:

Post a Comment